Unseen passage -case based -4- class 11/12

Welcome to your Unseen passage -case based -4- class 11/12

1. 

Based on your understanding of the passage, choose the option that lists the CORRECT order of thesentences.
1. The extent of the damage to Vikram is still being assessed.
2. The IIRS instrument, also on the orbiter, will tell us about water and minerals under the surface.
3. Vikram Lander deviated from the expected course, and got stuck, indicating that we had lostcommunication.
4. Chandrayaan-2 was launched in July on the GSLV-3.

2. 

How many days ago was Vikram Lander separated from the spacecraft?

3. 

For how long was it supposed to remain upon the lunar surface?

4. 

Why were the scientists happy when they saw the green dot on the trajectory?

5. 

Which things are required on the moon even if we don’t make it our habitat?

6. 

Chandrayaan-2 was supposed to land on......

7. 

Pick the option that tells the feeling of the writer when the Lander deviated from the expected course,and got stuck, indicating that it had lost communication

8. 

What is the function of CLASS instrument on the orbiter?

9. 

Which word in the passage means same as ‘Crucial’? (para 1)

10. 

Chandrayaan-2 was launched in July on the.............. .

11. 

The “15 minutes of terror” refers to

Leave a Reply